Background

Depot Locations : Cairns – Woree, QLD | Mackay – Paget, QLD

Followmont Transport completed construction of their new Cairns and Mackay depots in late 2019. As part of an ongoing commitment to operating in an environmentally conscious manner, there was a focus with both new depots designs to minimise carbon footprints. This drew Followmonts attention to Green Frog solar lights.

Solution

As a transport depot, Followmont is operating 24/7. The concrete base design with forklift tine spaces provides the ability to relocate the lights with a forklift. As a result, depots can utilise areas of the yard which awning mounted flood lights wouldn’t reach meaning that trucks can be loaded/unloaded in any area.

The installation of the lights was able to be completed within hours by in house team members thanks to the hinge plate design solution provided.

· Product Supplied in Mackay: 5 x GFS-200 Solar Street Lights
· Product Supplied in Cairns: 2 x GFS-200 Solar Street Lights

Outcome

Testimonial “Simon from Green Frog Systems was a standout from all other providers that were contacted when seeking quotes. Throughout the process, we were kept up to date on the status of our lights and all items were delivered with urgency. The consistent level of service provided by Simon has made Green Frog Systems our go-to for any solar lights and we look forward to working with them in the future.” Brooke Tice – Project and Property Coordinator

CASE STUDY

CASE STUDY
Portable Solar Lighting
Temporary Solar Lighting
mobile yard lighting
Temporary Solar Lighting

Get more info

By signing up you agree to our privacy policy. You can opt out anytime.

Mobile & Temporary Solar Lighting

Talk to us today!